Furniture is a trade where two businesses share one roof: a factory that cuts, assembles, polishes and upholsters, and a showroom or project team that sells, customises and installs. Each customer wants a slightly different size, fabric or finish. Timber and boards are bought in one unit and consumed in another. Polishing or upholstery may be sent to outside workers. And the true cost of a dining set is often unknown until long after it is sold.
This case brief explains what an ERP for furniture manufacturers needs to handle, for factories and showrooms in Kerala, across India and in the GCC, and how we approach it on ERPNext. It is written for owners and production heads, focused on flow and control. No invented figures or client names.
Key takeaways
- Decide your model per range: make-to-stock for standard ranges, make-to-order for custom pieces, and project-based for fit-outs.
- BOMs must capture timber, board, hardware, fabric, labour and overhead so the quoted price reflects real cost.
- Job work is normal for polishing, upholstery and carving. Track material sent and received through subcontracting.
- Close the loop at delivery: delivery, installation and after-sales issues should link back to the order.
Quoting a sofa without knowing its real cost?
Bring one product and its materials. In a free 30-minute call we will show how ERPNext would cost it, build it and track it to delivery.
Cost one product → WhatsApp us: +91 8089051848
Or email info@nexeves.com
Who this is for
Owners of wooden, steel and modular furniture factories; sofa and upholstery units; office furniture makers; interior fit-out workshops supplying hotels, villas and offices; and furniture retailers with their own workshops.
Three business models, one system
| Model | Typical products | How ERPNext handles it |
|---|---|---|
| Make-to-stock | Standard chairs, tables, beds, office desks | Standard BOMs, production plans from forecasts or reorder levels, finished goods in stock |
| Make-to-order | Custom sofas, dining sets in chosen size and finish | Sales order with specifications, variant or order-specific BOM, work order linked to the order |
| Project-based | Hotel rooms, villa interiors, office fit-outs | Project with sales order, multiple BOMs, material issue to site, installation tasks |
Most furniture businesses run all three. The system needs to keep them separate in planning and costing, but share materials, machines and people.
Challenge 1: Costing a piece correctly
A good furniture BOM includes more than materials:
- Timber in cubic feet or cubic metres, with a wastage allowance
- Boards (plywood, MDF, particle board) in sheets, with cutting yield
- Hardware such as hinges, slides, handles and screws
- Finishing materials: polish, lacquer, paint, laminate, veneer
- Upholstery: foam, fabric or leather by metre, webbing
- Operations and labour with times at workstations such as cutting, joinery, sanding, polishing, upholstery
- Packing and, where relevant, delivery and installation
ERPNext BOMs support raw materials, scrap, operations with workstation hourly rates and sub-assemblies. When the BOM is complete, the BOM cost becomes a reliable floor for quotations. Our guides to BOMs in ERPNext and manufacturing costing in Kerala go deeper.
Challenge 2: Custom sizes, fabrics and finishes
For ranges with fixed options, use item variants with attributes such as size, wood, finish and fabric, so each combination has its own code, price and stock. For truly custom pieces, create the BOM from the sales order with the agreed specifications, and attach drawings to the order. Keep the specification on the work order so the workshop builds what was sold.
Challenge 3: Timber and board units
Timber is bought by volume and consumed by piece or cut length. Boards are bought by sheet and used as panels. Set the stock unit to what the store can count, and use conversion factors for purchase. Record offcuts that can be reused as a separate item or as scrap with a value, and review timber yield monthly, because it is often the biggest hidden cost. Our post on reducing manufacturing wastage shows the approach.
Want our furniture BOM template?
We will send the BOM and costing template we use for wood, board and upholstered furniture, with labour and overhead lines.
Send me the template → WhatsApp us: +91 8089051848
Or email info@nexeves.com
Challenge 4: Job work for polishing, upholstery and carving
Many factories send semi-finished pieces to outside polishers or upholsterers. ERPNext's subcontracting flow records the material sent, the service charge and the finished piece received, so stock and cost stay complete. In India, goods sent for job work need the right challan and GST treatment; ask your CA and see our subcontracting and job work guide.
Challenge 5: Planning the workshop
- Use work orders per piece or batch, with job cards per operation so supervisors see what is at cutting, polishing or upholstery.
- Use production planning to roll up material needs across orders and raise material requests for timber, boards and hardware.
- Track delivery promise dates on sales orders and compare them with work order progress weekly.
See how to reduce production delays and advanced production planning.
Challenge 6: Showroom, advances and delivery
Showroom sales usually involve an advance, a balance on delivery and sometimes finance. ERPNext records advances against the sales order and adjusts them in the invoice. Delivery notes and delivery trips plan dispatch, and installation can be tracked as tasks or through Installation Notes. After-sales complaints such as a loose hinge or polish damage can be logged as issues or warranty claims linked to the customer.
For showrooms with walk-in retail, the POS can handle accessories and ready stock; see ERP for retail shops in Kerala.
Challenge 7: Fit-out projects
For hotel, villa and office projects, combine a project with the sales order, multiple BOMs per room or area, material issue to site, subcontractor bills and progress billing. Retention and variation orders are common in the GCC. See ERPNext for construction and contracting in the GCC.
Tax and exports
| Market | Points to set up (confirm with your adviser) |
|---|---|
| India | GST by HSN on each item through item tax templates; rates on furniture differ by material and have changed over time. E-invoice and e-way bill where applicable. Job work challans |
| India exports | Export invoices under LUT or with IGST, in foreign currency. See ERPNext for exporters |
| UAE | VAT at 5%; Arabic on consumer invoices |
| Saudi Arabia | VAT at 15%, Arabic invoices with QR code; ZATCA Phase 2 via an add-on app |
| Qatar and Kuwait | No VAT in force |
What owners should measure
- Estimated vs actual cost per order, especially timber, board and labour
- On-time delivery against promise date
- Gross margin by product range and by channel (showroom, project, export)
- Work in progress value and ageing
- Rework and after-sales complaints by product
For the margin view, read which customers and products really make money.
Questions to ask before choosing a system
- Can it cost a piece with timber, board, hardware, labour and overhead, and compare estimate with actual?
- Can it handle custom orders without creating a mess of item codes?
- Does it track material sent to outside polishers and upholsterers?
- Can the showroom see production status for a customer's order?
- Can it run factory, showroom and projects in one database with separate reports?
Frequently asked questions
Is ERPNext suitable for furniture manufacturing?
Yes. ERPNext supports BOMs with materials, operations and sub-assemblies, work orders and job cards, subcontracting, variants and made-to-order production, along with sales, stock and accounts.
How do I handle custom furniture orders in ERPNext?
Capture the specification on the sales order, create an order-specific BOM or use variants for fixed options, and link the work order to the sales order so the workshop builds what was sold.
Can ERPNext track polishing or upholstery done by outside workers?
Yes, through subcontracting. It records material sent, the service charge and the finished piece received, so stock and cost are complete.
How should timber be measured in ERPNext?
Use a stock unit the store can count, with conversion factors from the purchase unit. Record offcuts and scrap, and compare BOM consumption with actual issues to measure yield.
Can ERPNext manage both factory and showroom?
Yes. Factory, showroom and projects can run in the same system with separate warehouses, cost centers and reports, sharing items and customers.
Does ERPNext support furniture exports from India?
Yes. It supports export invoices in foreign currency, under LUT or with IGST, with shipping details. Confirm the GST treatment with your CA.
From showroom order to installed piece, in one system
Nexeves Technologies implements ERPNext for furniture factories, interior fit-out workshops and showrooms in Kerala, across India and in the GCC.
Book a free demo → WhatsApp us: +91 8089051848
Or email info@nexeves.com
Nexeves Technologies serves India & the GCC: UAE (Dubai, Abu Dhabi), Saudi Arabia (Riyadh, Jeddah), Qatar (Doha), Kuwait and Bahrain.
No comments yet. Login to start a new discussion Start a new discussion